SLIDE 1 (HOOK / COVER) ⚡ NEC Quick Hit: Modular Data Centers (Part 1 - Scope & Nameplates) ⚡
Preassembled, containerized server rooms delivered straight to the job site—welcome to Article 646. How does a prepackaged modular data center (MDC) differ from a standard site-built ITE room? Let's break down the fundamentals! 👇
What is a Modular Data Center (MDC)?
Factory-Built Enclosures: MDCs include installed information technology equipment (ITE), HVAC, power distribution, and grounding housed inside a preassembled, portable equipment enclosure (often called a containerized data center).
The Difference: While an ITE room (Article 645) is built and equipped on-site inside a permanent building, an MDC arrives prepackaged. Because they are large enough for personnel to enter, they have specific access and working space rules.
Listing and Enclosure Data:
Listed & Labeled: All MDCs must be listed and labeled (evaluated to standards like UL Subject 2755).
Permanent Nameplate: Each enclosure must feature a visible permanent nameplate detailing supply voltage, phases, frequency, full-load current, service short-circuit current rating (SCCR), and electrical diagram numbers.
💡 Apprentice Pro-Tip: Always check the MDC nameplate before pulling feeders to a containerized data center. The marked full-load current dictates your minimum conductor ampacity, and the SCCR tells you if the enclosure can handle the available fault current!
💬 Save this post for your next containerized data center hookup! 🔗